Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

STAAD COLUMN BRACING

Status
Not open for further replies.

AZIALLURE

Civil/Environmental
Feb 8, 2007
3
I AM TRYING TO MAKE A PROGRAM IN STAAD WITH A 30FT COLUMN. BRACING Y-Y 1/3 PTS. PINNED AT BOTH ENDS. WITH A DEAD LOAD AND LIVE LOAD. CAN SOMEONE HELP ME HOW TO PUT CODES IN FOR THE 1/3 OF THE LENGTH BRACING AND THE LOADS. SHOULD IT BE A JOINT JOAD AT THE TOP? OR A CONCENTRATED LOAD THROUGHOUT?
 
Replies continue below

Recommended for you

In the Steel Design section, set the LY length parameter to 1/3 of the length. Be sure to use the right units.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor