AussieAnton
Mechanical
- Sep 9, 2010
- 4
Hi All,
Has anyone got any experience with splicing univeral beams together (end to end). I've found some dodgy sections in a structure and was planning on getting the suspect sections cut out and replaced.
My initial thoughts were simply a straight cut with full penetration butt welds all round but someone has asked whether we should be offsetting the cuts (and welds) on the top and bottom flanges.
Also, any thoughts on weld specs? Is low hydrogen required? MIG or stick better?
Thanks
Anton
Has anyone got any experience with splicing univeral beams together (end to end). I've found some dodgy sections in a structure and was planning on getting the suspect sections cut out and replaced.
My initial thoughts were simply a straight cut with full penetration butt welds all round but someone has asked whether we should be offsetting the cuts (and welds) on the top and bottom flanges.
Also, any thoughts on weld specs? Is low hydrogen required? MIG or stick better?
Thanks
Anton