Costru
Civil/Environmental
- Sep 24, 2008
- 1
How can we optimized Side face distance (Concrete edge to Center of bar) while using headed anchor in place of hooked bar/development length. Code to be referred. ACI 318-05 Section D5.4
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.