I'm slightly confused at how the time of concentration and flow should be calculated when a curb/gutter is combined with sheet flow.
For example say you have 150 ft x 400 ft parking lot that is sloped to a curb on one side this slope Sx=0.03ft/ft and the slope of the curb/gutter, SL=0.003ft/ft. I would assume the time of concentration is equal to the sheet flow time over 135ft to get to the gutter plus the time from the gutter to the inlet. However I'm not sure how to use the appropriate equations for gutter flow in conjunction with sheet flow to arrive at an answer.
Or the if I use the time of concentration for sheet flow to solve for my flow into the channel (Q=CIA where I is based on Tc for sheet flow). However then I'm confused as to how I would find the different Flow rates at the begining and end of the channel.
See attached.
How do you calc spread T1 and T2 to find average velocity?
Thanks again
EIT
For example say you have 150 ft x 400 ft parking lot that is sloped to a curb on one side this slope Sx=0.03ft/ft and the slope of the curb/gutter, SL=0.003ft/ft. I would assume the time of concentration is equal to the sheet flow time over 135ft to get to the gutter plus the time from the gutter to the inlet. However I'm not sure how to use the appropriate equations for gutter flow in conjunction with sheet flow to arrive at an answer.
Or the if I use the time of concentration for sheet flow to solve for my flow into the channel (Q=CIA where I is based on Tc for sheet flow). However then I'm confused as to how I would find the different Flow rates at the begining and end of the channel.
See attached.
How do you calc spread T1 and T2 to find average velocity?
Thanks again