Mudcake
Geotechnical
- Jul 11, 2003
- 6
I have seen engineers using 1% of pile diamater as an estimate for setllement pile when the maximum load (or capacity) is reached. Where did this come from? Any references?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.