lpf
New member
- Aug 29, 1999
- 1
i am currently working on a project which involves the extension of an existing sanitary sewer system into our property to service 4 homes. based on the soil borings that were taken, it is very possible that the proposed sewer main will have to be constructed within, or very,very near the water table. i am looking for information pertaining to the construction techniques used in this type of situation.