TAC
Geotechnical
- Feb 1, 1999
- 36
We are preparing for a road reconstruction project utilizing various recycled scrap tire products (devulcanized and crumb rubber and tire shreds) The pavement for the road will consist of 1.5 inches of hot mix asphalt containing devulcanized rubber over 1.5 inches of cold mix containing crumb rubber. We have not worked with either material previously and I am trying to pull together the pavement specs. If anyone has any experience with these materials or knows of anyone who may be able to help, I would appreciate any info.