vobs
Structural
- Apr 25, 2002
- 12
I have a question regarding the load path from a near horizontal diaphrgam (slpoed roof) to an exterior shear wall, as in an eave condition. If the load is low enough, I specify and unblocked diaphragm and call out a Simpson connector to transfer the load from the trusses to the top plate. If the load is higher, I call out a blocked diaphragm, including the eaves. The problem then is to provide attic ventilation. I tell them to drill a couple of holes in the blocking and cover it with wire mesh. The contractor is having fits with this. Does any one else handle this differently? Thanks.