vicki932
Civil/Environmental
- Oct 9, 2006
- 14
If constructing underwater or construction “in the wet”, does anyone know if there are guidelines to when to excavate and construct a “trench toe”? I’m looking in an area that can be as deep as 15 feet below sea level. The trench toe (launchable riprap toe) would be excavated under the toe of the slope to launch as scouring occurs to the max scour depth. The slope toe in several areas of the river can be more than 10 feet below the mean lower low, so am concerned if it is possible for this type of rock protection. The other option was the mounded toe, but my concern is that due to the volume required that it would be a problem with the obstruction to flow.