ag89
Structural
- May 2, 2001
- 35
In the design of the drilled shaft to acommodate a long span rigid frame, how is the lateral force handled from the rigid frame reactions, which is substantial? Do you tie back into the slab or tie the columns together with enough tension reinforcing that the load cancels out?