manj1987
Electrical
- Apr 12, 2011
- 16
Hi,
We have and oil tank which client wants to be used for water now. We have to give a scope of work for this job. my understanding is that our scope of work will include following things:
1- complete on site inspection of tank as per API 653(we will sub-contract this work)
2- from inspection report i being a static design guy will check whether actual thickness can bear the water head using api 650 formula.
kindly confirm my understanding
We have and oil tank which client wants to be used for water now. We have to give a scope of work for this job. my understanding is that our scope of work will include following things:
1- complete on site inspection of tank as per API 653(we will sub-contract this work)
2- from inspection report i being a static design guy will check whether actual thickness can bear the water head using api 650 formula.
kindly confirm my understanding