wayuu1981
Mechanical
- Sep 15, 2006
- 47
Hello,
We need to contract a company to remove three (3) old safety valves, and install new valves on a 150 MW coal fired boiler (the valves have been previously purchased with V stamp, and they are stored in the plant ready to be installed).
What kind of stamp is required for the company that will remove the old valves and will intall the new ones? each valve have to be butt welded to a 4" diameter pipe sch 160.
In my country ASME and NB are not mandatory, but the insurance company requires us to follow those codes.
As the company will only do the welds (with the required NDE tests and thermal reliefs if required) with no disassembly, assembly, inspection, calibration or test of the valves; is an "R" stamp enough for that company to perform this work according to the code? what other stamps or recommendation do we have to consider when contracting a company for this work?
Thanks for you help.
Javier Guevara E.
Projects, Mechanical Engineer
We need to contract a company to remove three (3) old safety valves, and install new valves on a 150 MW coal fired boiler (the valves have been previously purchased with V stamp, and they are stored in the plant ready to be installed).
What kind of stamp is required for the company that will remove the old valves and will intall the new ones? each valve have to be butt welded to a 4" diameter pipe sch 160.
In my country ASME and NB are not mandatory, but the insurance company requires us to follow those codes.
As the company will only do the welds (with the required NDE tests and thermal reliefs if required) with no disassembly, assembly, inspection, calibration or test of the valves; is an "R" stamp enough for that company to perform this work according to the code? what other stamps or recommendation do we have to consider when contracting a company for this work?
Thanks for you help.
Javier Guevara E.
Projects, Mechanical Engineer