kallbee
Mechanical
- Jan 11, 2002
- 1
I am in the process of refininshing my basement and would like to remove one lally column.
The house is a Split Entrance, with foundation measurment of 24' x 42' (exterior)
All floor joists are 2x8 (x 12' long, thus do not runn past over the main beam)
Main beam is 3) 2x8's spiked together with slices in the center section at 7' - 21' and 35'. Splices on the outside sections are at 14' and 28'.
Beam is on centerline of foundation
Knee wall is stick built 2x4 construction and lally columns are about 7' o.c. (5 of them).
Have head room (6'-8" headroom under) for max of 11-1/4" deep laminated beam.
I would like to:
LEAVE existing beam in place
Add glulam/paralam/plywood box beam to either side of said beam to span to second lally column (at 14' from ext. of foundation)
Beef up the 30x30x12 footing, if required
add new columns, (in line with existing column at 14' form ext. foundation), as required
and REMOVE the lally column at 7' from the ext. of foundation.
As I figure it, if I beef up the gable end knee wall to 2x6 where it supports the new beams (increase bearing to 5-1/2"
, and add 6x6 posts next to the lally I'm leaving (at 14' from the ext. of the foundation wall), the simple span of each new beam will be > 13'-2".
Does anyone know which type of beam would be best to span this new opening which will require an 11-1/2" or less depth? If my idea is not valid as it stands, any other suggestions as to how you may have solved a similar situation?
Thanks in advance,
The house is a Split Entrance, with foundation measurment of 24' x 42' (exterior)
All floor joists are 2x8 (x 12' long, thus do not runn past over the main beam)
Main beam is 3) 2x8's spiked together with slices in the center section at 7' - 21' and 35'. Splices on the outside sections are at 14' and 28'.
Beam is on centerline of foundation
Knee wall is stick built 2x4 construction and lally columns are about 7' o.c. (5 of them).
Have head room (6'-8" headroom under) for max of 11-1/4" deep laminated beam.
I would like to:
LEAVE existing beam in place
Add glulam/paralam/plywood box beam to either side of said beam to span to second lally column (at 14' from ext. of foundation)
Beef up the 30x30x12 footing, if required
add new columns, (in line with existing column at 14' form ext. foundation), as required
and REMOVE the lally column at 7' from the ext. of foundation.
As I figure it, if I beef up the gable end knee wall to 2x6 where it supports the new beams (increase bearing to 5-1/2"
Does anyone know which type of beam would be best to span this new opening which will require an 11-1/2" or less depth? If my idea is not valid as it stands, any other suggestions as to how you may have solved a similar situation?
Thanks in advance,