Beamman
Structural
- Sep 29, 2000
- 12
Hi All,
I have a situation where the contractor installed reinforcing dowels after the concrete was placed in the wall, rather than installing the dowel and placing concrete afterwards.
I cannot find information regarding this situation - whether the codes allow this, and if so what would the calculated tension capacity be? It would seem to me it would be less than if cast in.
Thanks for any information to shed light on this.
Regards,
Beamman
I have a situation where the contractor installed reinforcing dowels after the concrete was placed in the wall, rather than installing the dowel and placing concrete afterwards.
I cannot find information regarding this situation - whether the codes allow this, and if so what would the calculated tension capacity be? It would seem to me it would be less than if cast in.
Thanks for any information to shed light on this.
Regards,
Beamman