I was reading over an article on the narrow shear wall. (Link) If i were to use the option "b" that's discussed, would I be able to use some simpson mstc straps to make a continuous header. I have posts breaking up a header in two locations and believe a couple of straps to make it continuous. or possibly a CMST14 cut to the full length of wall. Attached is a pdf of a model as described.
Thanks for the help!
Andrew
I was reading over an article on the narrow shear wall. (Link) If i were to use the option "b" that's discussed, would I be able to use some simpson mstc straps to make a continuous header. I have posts breaking up a header in two locations and believe a couple of straps to make it continuous. or possibly a CMST14 cut to the full length of wall. Attached is a pdf of a model as described.
Thanks for the help!
Andrew