mweng
Civil/Environmental
- Nov 15, 2002
- 29
What is standard protocol for evaluating whether an existing fire service to a building should be replaced? The building is undergoing a major expansion. The size of the existing line and the pressure/flow in the water main is adequate. The only question is whether the existing on-site fire service line should be replaced.