Spirit
New member
- Oct 29, 2001
- 93
hi all, i am a newbie at this site.
I have a question: we are testing a mechanical equipment to operative life fatigue using the PSD recovered during normal work. My question is: having to verify the reliability over all the lifecycle of the equipment, is it possible to test the item only to a limited time with a PSD environment modified, instead than the nominal PSD over all the operative life duration? Thx in advance.
I have a question: we are testing a mechanical equipment to operative life fatigue using the PSD recovered during normal work. My question is: having to verify the reliability over all the lifecycle of the equipment, is it possible to test the item only to a limited time with a PSD environment modified, instead than the nominal PSD over all the operative life duration? Thx in advance.