JFCPEng
New member
- Sep 21, 1999
- 10
Hong Kong rail, Korean supermarket, Taiwan, Turkey, Greece, earthquakes and failures! Where are the quality assurance experts on concrete construction? I've spent many years on construction, and still the Architect, the builder, the workers cannot consistently reproduce high quality easily or with 99.999% confidence! It seems a pity to build every structure on concrete footings with poor QA during construction. How much does a petrochem pipe rack settle before the free spanning pipe is "stressed"? I'm studying "failures", or FMEA out of interest. Retempered concrete, stale concrete, incorrect delivery, poor placement methodology, inexperience, poor sampling, poor curing, excessive water, corrosion, alterred rebar placement, poor detailing or scheduling, green loading, incompatable tolerancing, etc.