wshi
Geotechnical
- Mar 22, 2005
- 6
Hi all,
According to WSDOT Getechincal Design Manual(6.5.3.1), horizontal pseudo-static coefficient Kh=0.5*PGA, the PGA at Everett, WA is 0.3, so I think Kh is 0.5*0.3=0.15.
But I read some getechnical reports, Kh=0.5*0.3*1.18=0.177 was used in these reports. what does 1.18 mean?
Thanks
According to WSDOT Getechincal Design Manual(6.5.3.1), horizontal pseudo-static coefficient Kh=0.5*PGA, the PGA at Everett, WA is 0.3, so I think Kh is 0.5*0.3=0.15.
But I read some getechnical reports, Kh=0.5*0.3*1.18=0.177 was used in these reports. what does 1.18 mean?
Thanks