stockdam
Aerospace
- Apr 18, 2007
- 33
Hi,
I have a problem printing a small Gannt chart.
When I try to fit it onto a single page I get most of the schedule but I am missing some bars/milestones as the printed timescale does not cover the whole project (hence some of the milestones etc are "off" the right hand side of the page).
I can eventually get it to work if I select View and instead of selecting the whole project I select View/200 weeks (which is 3 or 4 times longer than the project timescale.
Any suggestions as to why - I'm using MSProject 2002.
I have a problem printing a small Gannt chart.
When I try to fit it onto a single page I get most of the schedule but I am missing some bars/milestones as the printed timescale does not cover the whole project (hence some of the milestones etc are "off" the right hand side of the page).
I can eventually get it to work if I select View and instead of selecting the whole project I select View/200 weeks (which is 3 or 4 times longer than the project timescale.
Any suggestions as to why - I'm using MSProject 2002.