timmed
Mechanical
- Aug 5, 2011
- 1
hi. I've been assigned recently to learn the primavera software. I haven't had a formal training on the software. I just watched a couple of videos tackling the basics of primavera p3. So anyone knew how to make an s-curve using primavera p3? how about manpower scheduling and loading? Can it be reflected on the chart? thanks