Thecapn007
Materials
- Jun 20, 2006
- 2
I was called out to a job for what a customer called "spoingey" concrete. He stated that the job called for a 9.5 yard order and would have no order back. Well the job goes as planned, up until the finisher calls complaining that the concrete just "took off" and then cracked all to hell. The mix was a 1" mix,5 sac with water reducer. No water was added at the job site, and the weather was warm with a bit of a breeze blowing. Now warm l mean it was in the 90's and the breeze about 10 mph. When l went to the job site l noticed the cracking had appear where they should be, in the control joints, but that most would jump out of them and come back in. Typical plastic shrinkage cracks were about but not terribly frequent, and on all inverted corners they were right there too! Tell me this, l think l know what happened, but is the finisher trying to pull a fast one over on my company. He thinks we over dosed the product with water reducer. l think not, not even close. Give me a professional way to tell this guy, we aren't buying this load for him! Yours truly, Q.C. man!