1
- #1
geodoc
Geotechnical
- Feb 20, 2003
- 9
Piles will be driven within 10 to 25 ft of existing building. It is likely that vibrations from the pile driving will exceed allowable levels. Besides drilling the piles in, does anyone have any proven methods for driving the piles and keeping the vibrations to acceptable limits? Obviously, I do not want to damage the buildings but I also want a method that works so that the contractor does not have to stop because of vibration concerns. I have seen options such as drilling a casing to a predetermined depth (seems arbitrary), removing the soil, and then driving the pile. How effective is this technique? Any help?