jjeng2
Structural
- Nov 15, 2004
- 157
I have a slab on grade that has been designed as 6" per the ACI/PCA method for point and distributed loading. The client wants an alterante which will include a heat/snowmelt system which will consist of PEX tubing at 8" c/c. Are there any ACI references to account for this within the structural slab? What if I pour 6" of structural slab and embed the tubing in a few additional inches of concrete under the 6"? Does this then become my "subgrade"? Any thoughts, references, or experience would be appreciated.