rokahn
Mechanical
- Jul 5, 2002
- 48
I have a SW assembly already in the PDM/Works vault.
I want to add a new BOM document (MS Word) which will be the "master document". As such, the SW assembly should refer to it. I can't figure out how to make an assembly already in the vault refer to a new file without deleting it from the vault and checking it back in.
Any thoughts?
I want to add a new BOM document (MS Word) which will be the "master document". As such, the SW assembly should refer to it. I can't figure out how to make an assembly already in the vault refer to a new file without deleting it from the vault and checking it back in.
Any thoughts?