mel127
Electrical
- Dec 13, 2007
- 27
We are planning to install 2 additional neutral conductors on a 3 phase, 5 KV circuit (2 circuits for redundancy). The conductors are underground. The entire run will cover 11 manholes at about 3000 feet. We are looking at different options and the correct way to do it. First option is to pull out the feeders and run tne new neutral in the same conduit as the feeders. Second option is to run the neutral conductors on a spare conduit in the ductbank. If we are to consider option number two are we violating any codes, is there any other issues besides the code? Please advise.TIA.