Tweetybird
Petroleum
- Feb 24, 2006
- 15
Management wants to relocate small process plant with a number of pressure vessels to different location. All vessels will be in exact same service. They also want to inspect all vessels via API 510 before re locating.
another prevailing thought being proposed is the vessels should be inspected after re location. Not sure if this would come under 579 FFS since service is exactly the same.
Just seeking the wisdom and input available via eng-tips
Thanks,
Lee
another prevailing thought being proposed is the vessels should be inspected after re location. Not sure if this would come under 579 FFS since service is exactly the same.
Just seeking the wisdom and input available via eng-tips
Thanks,
Lee