zliazmei
Structural
- Feb 5, 2002
- 97
Hi all!
I have a problem.
Please,help. I need to combine the generated moving loads with dead loads.
do you know any way to do it without ading 164 lines of type
:combo 1 1.26 i=3to168 1.4: or wethever the sintaxis of it was
))
10X in advance
regards zmei
may be VBA?!?!??!?
![[hairpull] [hairpull] [hairpull]](/data/assets/smilies/hairpull.gif)
I have a problem.
Please,help. I need to combine the generated moving loads with dead loads.
do you know any way to do it without ading 164 lines of type
:combo 1 1.26 i=3to168 1.4: or wethever the sintaxis of it was
10X in advance
regards zmei
may be VBA?!?!??!?
![[hairpull] [hairpull] [hairpull]](/data/assets/smilies/hairpull.gif)