tf240
Marine/Ocean
- Apr 14, 2012
- 2
What are average periods which moorings for fixed structures such as wave devices, must be left for soil/sediment to settle, I have a source stating 1-6 months but no good information to back this up.
I also wonder whether moorings are often installed in the winter when sea conditions are less of an issue for installation as opposed to installing wave or wind devices?
I also wonder whether moorings are often installed in the winter when sea conditions are less of an issue for installation as opposed to installing wave or wind devices?