Doing a three story red iron bldg, they are hanging this week. Its loaded with moment welds, every connection. The weld is a B-u4a which is basically a groove butt weld unlimited thickness with a 45 degree and a 1/4 inch root, with backing. My question is, since the whole bldg is moment, how are they going to maintain the 1/4 root. I'm on the betting side that they are not going do it. Start complaining like contractor do and say its not possible. I'm asking because I can already see the fighting begin.If one column is out of measurement, then the 1/4 be out. please advise