jakin
Geotechnical
- Oct 19, 2004
- 32
To support a structural foundation slab within a building with very limited headroom, specs call for minipiles (1-3/4" Dywidag rod in 5-1/2" hole); tolerance of max 2% to vertical. Soil is 18' dense fill, 20' very soft to soft clay, and medium to stiff clay down to hardpan at 90' depth. Contractor proposes change to concrete-filled segmental pipe piles (including 5-1/2" and 3-1/2" diameter). I am concerned about the proposed substitution. Any ideas?