March 28, 2022 A parking garage which was being demolished collapsed under the weigh of demolition machinery operating on the 9th floor.
March 30 MBTA immediately resumes Orange Line service after inspections following Boston garage collapse
April 1 MBTA’s plan to fully reopen Green Line following partial parking garage collapse
Several hundred tons of broken parking garage must be removed before inspections can be performed to determine if the green line can be reopened.
[URL unfurl="true" said:https://www.msn.com/en-us/news/us/it-s-really-horrible-mbta-service-disrupted-after-parking-garage-collapse/ar-AAVB8BN#:~:text=The%20MBTA%20was%20forced%20to%20reroute%20when%20the,a%20loving%20son%2C%20brother%2C%20father%2C%20uncle%20and%20friend.[/URL]]The MBTA was forced to reroute when the Government Center parking garage partially collapsed Saturday night, killing 51-year-old demolition worker Peter Monsini. He was jackhammering on the ninth floor when the ground gave way.
March 30 MBTA immediately resumes Orange Line service after inspections following Boston garage collapse
April 1 MBTA’s plan to fully reopen Green Line following partial parking garage collapse
Several hundred tons of broken parking garage must be removed before inspections can be performed to determine if the green line can be reopened.