I have a long span two way slab situation and the basic info is like this: the slab is 120 feet by 90 feet and the slab is supported only by perimeter walls or columns. There are three PT beams in the short direction and two PT beams in long direction and therefore the spaning between beams or between beam and slab perimeter is 30 feet. Note that there are only perimeter supports and no intermediate supports.
Apparently the PT beams in both directions work in two-way reaction to share all the loads. Has anyone have experience on such a structure? Any comments or suggestions are welcome.