Riggly
Geotechnical
- Feb 17, 2004
- 117
I am seeking advise on the how to repair localized soil failure within crib walls.
The walls range in height from 11 ft to 22ft, and the soil is sloped behind the walls and rise several feet above the top of wall. Several localized areas within the walls have exhibited moderate to severe soil lost. Is there any means/techniques out there to replace the soil without tearing down the walls?
Is placing geofabric just behind the face of the wall in order to retain the soil acceptable?
Any thoughts?.
Thanks