tclat
Structural
- Oct 28, 2008
- 109
Hi All,
I'm analyzing a five storey hotel that has 16 foot cantilever balconies. Floor to floor height is 10 feet. The good thing is there are reinforced concrete party walls at 15'0 centers between each room which also extent out to almost the end of the balcony. The party walls extend 30 feet inside (full bearing down to the ground) although a couple of them have doors linking t40 rooms together (15 foot from the balcony). I'm running some preliminary calcs to advise the architect if this system is possible.
I'm considering spanning the slab 15 foot to the party walls and using the walls as deep cantilever beams.
If I consider that the cantilever depth is 4 x 10' = 40 feet, then a 16 foot cantilever really doesn't seem that bad both for strength and serviceability. Obviously, this deep beam will be cast in 10 foot sections as the building progresses so I will have to check the the shear flow at each construction joint but even 10 foot beam depth seems fine for long term deflections. I also need to consider temporary loading during the construction stage.
Any thoughts/comments?
Thanks
I'm analyzing a five storey hotel that has 16 foot cantilever balconies. Floor to floor height is 10 feet. The good thing is there are reinforced concrete party walls at 15'0 centers between each room which also extent out to almost the end of the balcony. The party walls extend 30 feet inside (full bearing down to the ground) although a couple of them have doors linking t40 rooms together (15 foot from the balcony). I'm running some preliminary calcs to advise the architect if this system is possible.
I'm considering spanning the slab 15 foot to the party walls and using the walls as deep cantilever beams.
If I consider that the cantilever depth is 4 x 10' = 40 feet, then a 16 foot cantilever really doesn't seem that bad both for strength and serviceability. Obviously, this deep beam will be cast in 10 foot sections as the building progresses so I will have to check the the shear flow at each construction joint but even 10 foot beam depth seems fine for long term deflections. I also need to consider temporary loading during the construction stage.
Any thoughts/comments?
Thanks