racv2
Civil/Environmental
- Jul 16, 2003
- 27
Hello,
I imported a Hydrocad file from version 3.01 (1994) into my current Hydrocad version 8.5, and the peak inflows (Q) for a Proposed Pond, went from 1.6 cfs (original report) to 0.64 cfs.
I have checked for any possible errors in the Subcatchment areas, CN's, Tc's, rainfall depth for the 10-yr and 100-yr events, etc. and all the parameters seem to be similar to what they used back then, and still the Q's (in and out) are different.
I haven't changed anything, just imported the file (project) and run it for the 10 and 100-year events.
Any ideas why these could be happening? Thank for any help.
I imported a Hydrocad file from version 3.01 (1994) into my current Hydrocad version 8.5, and the peak inflows (Q) for a Proposed Pond, went from 1.6 cfs (original report) to 0.64 cfs.
I have checked for any possible errors in the Subcatchment areas, CN's, Tc's, rainfall depth for the 10-yr and 100-yr events, etc. and all the parameters seem to be similar to what they used back then, and still the Q's (in and out) are different.
I haven't changed anything, just imported the file (project) and run it for the 10 and 100-year events.
Any ideas why these could be happening? Thank for any help.