cmm1080
Civil/Environmental
- Nov 11, 2008
- 17
How do I calculate the storage volume required if I have:
a. my impact, in cubic feet per second, to the site due to development
b. my proposed hydrograph
I NEED TO DETAIN ABOUT 12 CFS WITHIN A SUBSURFACE PIPE SYSTEM. I'm just not sure which time I need to compare that rate to in order to calculate the storage volume necessary.
Thx in advance.
a. my impact, in cubic feet per second, to the site due to development
b. my proposed hydrograph
I NEED TO DETAIN ABOUT 12 CFS WITHIN A SUBSURFACE PIPE SYSTEM. I'm just not sure which time I need to compare that rate to in order to calculate the storage volume necessary.
Thx in advance.