I am designing an assembly line for heavy containers with a lot of components attached inside and outside. Total weight is about 1700 lbs and the footprint is square 45 inch.
The assembly should be moved between 4 assembly stations at about every 3-4 hrs. What would be the cheaper way to do it? I am thinking of pneumatic platforms or platforms on balls and floor covered by steel sheet, etc.
The assembly should be moved between 4 assembly stations at about every 3-4 hrs. What would be the cheaper way to do it? I am thinking of pneumatic platforms or platforms on balls and floor covered by steel sheet, etc.