rook1
Structural
- Apr 25, 2003
- 21
Im a newbie on etabs.. id like to design a 5storey hotel.
the walls will be made from 10" CMU and 8" CMU on the top 3 floors.. The CMU are to carry all vertical loads including the lateral forces.. the slab of the entire bldg is hollowcore concrete planks.
any suggestions on wat properties to assign to the wall and slab?
help much appreciated!
the walls will be made from 10" CMU and 8" CMU on the top 3 floors.. The CMU are to carry all vertical loads including the lateral forces.. the slab of the entire bldg is hollowcore concrete planks.
any suggestions on wat properties to assign to the wall and slab?
help much appreciated!