We encountered a situation where grout is required to fill into a tube formed by two I beams. The beam is about 39ft long and the tube is about 8"x10" section.
Is the curing of the grout a concern in this case? I mean whether the grout can get strength inside a steel tube permernantly.
The question may be too naive. Thanks.