ace234
Structural
- Jan 29, 2004
- 6
if i have an existing villa on a soft clayish terrain and would like to excavate 4.0m from its lowest side by circa 8.0 m deep. any suggestions on how to contain the movement of the upper villa ??? seems like the latter has a concrete platform.