Cosimo
Civil/Environmental
- Jan 23, 2003
- 29
As part of an Arbitration proceeding, an inspector testified that he encountered a field weld on a steel beam at the dwelling in question. From a code persptive, which code governs this type work? (dwelling was contructed under IRC 2000) I assume there must be a requirement to have a P.E. 'certify' to the adequacy of the weld? The steel supplier was not involved as the builder took it upon himself to cut/splice the beam as he saw fit. Any input is appreciated.