Not to sure if anyone out there has used FEMA 356 yet, but i have a question that someone might have some background information on:
FEMA 356 differentiates in it's Unreinforced Masonry (URM) section between running bond and non-running bond walls, and also between fully grouted and partially grouted. This same distinction cannot be found in the Reinforced Masonry (RM) section. Does this mean that as long as the wall under investigation is reinforced horizontally and vertically, that it does not matter if it is runnning or stack bonded, or if it is partially or fully grouted?
Any specific information, references, or background information would be appreciated.
FEMA 356 differentiates in it's Unreinforced Masonry (URM) section between running bond and non-running bond walls, and also between fully grouted and partially grouted. This same distinction cannot be found in the Reinforced Masonry (RM) section. Does this mean that as long as the wall under investigation is reinforced horizontally and vertically, that it does not matter if it is runnning or stack bonded, or if it is partially or fully grouted?
Any specific information, references, or background information would be appreciated.