braham0793
Mechanical
- Sep 3, 2015
- 36

Dear,
Good morning;
I would like to know the tolerance in millimeters between the separation of the bottom of the tank with the cemented base and of being outside the tolerance which is the correct correction process.
Example.- Template of the tab through the use of 20 lb. rope.
The tank is API 650.
Greetings.