We directional drilled a 3" HDPE dr17 sewer forcemain, 200 metres in sandy conditions. Driller bored the pilot hole and reamed back with a 10" reamer and used mud in the retrieval.
But when the forcemain came back it was oblong shaped. it doesnt look like the pipe failed but definately stressed.
The driller said he did nothing wrong, the engineer said that pipe shouldnt have failed as it had a safety factor of 8.
So im left with contacting the manufacturer. Just wondering if anyone has any input.
Thanks