yutaini
Mechanical
- Mar 15, 2001
- 18
Hi,
I'm a fresh graduate that just join the workforce as a process engineer. Currently, I'm task to set the control limits for a drying process. A sensor will determine the basket temperature just before it depart the dryer, and the time between basket is about 3 mins. So only one data is collected at every 3 mins intervial. The question is: What control chart will best suit this application. How to calculate the upper and lower control limits? Please advise. Thanks
Best Regards,
Yutaini
I'm a fresh graduate that just join the workforce as a process engineer. Currently, I'm task to set the control limits for a drying process. A sensor will determine the basket temperature just before it depart the dryer, and the time between basket is about 3 mins. So only one data is collected at every 3 mins intervial. The question is: What control chart will best suit this application. How to calculate the upper and lower control limits? Please advise. Thanks