In this thread thread507-84756 "SlideRuleEra" suggested that we compare the failure load of harness parts (5,000 lb) to one measure of the failure load of the steel member (the load at 36 ksi yield strength) and "haggis" came up with C4x5.4 spanning 9 ft. Is this correct approach? For 9 ft span and 5,000 lbs at middle I am getting C8x18.75 (Mmax=5*9/4=11.25 ft-kips, bending stress fb=11.25*12/11.00=12.27 ksi, allowable bending stress Fb=13.68 ksi for unbraced length Lb=9ft).
Other question: I couldn’t find any document related to direction of 5,000 lbs. Does this load have to be applied in vertical direction only?