pmarc
Mechanical
- Sep 2, 2008
- 3,227
It is allowed to have datum callouts specified at MMB even if datum targets are used to establish a datum. If you are trying to establish datum axis based on e.g. 2 sets of 3 datum target points you can defined them on RMB (RFS) basis or MMB (MMC) basis.
Y14.5M-1994 did not specifically offer such possibility. Paragraph 4.6.4 is only mentioning RFS option.
Y14.5-2009 introduces MMB option in paragraph 4.24.10.
Y14.5M-1994 did not specifically offer such possibility. Paragraph 4.6.4 is only mentioning RFS option.
Y14.5-2009 introduces MMB option in paragraph 4.24.10.