pimheinkool
Mining
- Apr 18, 2000
- 11
An old tailings dump is reclaimed using high pressure hydraulic monitoring. After being processed in an acid leaching plant the remaining tailings are pumped to a newly constructed tailings disposal facility (new tailings dam). Preliminary hydrogeological studies indicate a possible leakage of 2,000 m3/day at the facility. To me, this seems quite a lot. What do you think? Many thanks in advance!
Pimhein Kool
Pimhein Kool