cvg
Civil/Environmental
- Dec 16, 1999
- 6,868
some specs I have seen require ground surface to be at the final level before placing sheet piles. however, a) that makes it difficult to install tie backs and b) placing fill before piling is not always feasible. so, what precautions should be taken if compacted fill is to be placed behind piles?